Layed out, cut and trimmed right elev skin. Pilot drilled and prep'd -08, elevator hinges. Prep'd -03, -04, -06, -07 elevator ribs. Assembled -01, Elev Root Rib Drive Assy. Welded assembly was hard to updrill. Used three updrill stages and some were still hard to get through.